Solar energy saves the environment, your finances and provide energy self-sufficiency.
Production of electricity from solar radiation dispenses entirely without additional fuel, raw materials and costs.

Photovoltaic Systems
Family houses solutions

Get your own Photovoltaic system.

  • Solar energy does not pollute the environment.
  • The state supports solar power in the form of a home in a new green savings program.
  • Photovoltaic power does not burden your surroundings without noise, odors, dust, fumes or harmful radiation.
  • The production of solar energy does not require any additional fuel or raw materials.
  • Photovoltaic power plant produces no waste.
  • No need to buy electricity from fossil fuels, the price increases every year.
  • Photovoltaic power plant does not require extensive maintenance or other investments.

Solar power plants have a lifespan of up to 30 years.

Do you want more information?

Leave us your contact information and we will contact you.

* fields marked with a star are required

We deliver turnkey photovoltaics

What is all part of the menu

Technology

  • Solar Panels
  • Converter (inverter)
  • Switchgear and circuit breakers - surge protection
  • Construction
  • Wiring - Cabling
  • Accumulation tank or heating coil - in the case of energy storage water heater
  • Battery - in the case of accumulation of energy to the batteries

Installation

  • Consulting
  • User training and recommendations to the appropriate mode of operation.
  • Transport and assembly.
  • Connecting and setting up the system, including functional testing, and revision.

Handling paperwork

  • Project documentation
  • Complete processing of grant applications
  • Grid connection
  • Building Authority
  • License
  • Registration in the OTE
  • Ensuring purchase surplus electricity to the specific distribution system - if necessary

Other options

  • Power management of the electricity produced wattrouterem
  • Monitoring FVE
  • Securing financing

Example of 1 MWp PVP yield per month

Example of 1 MWp PVP yield per month - graph
Popis tabulky
Month kWh měs. přínos
January 152 28 €
February 233 43 €
March 408 76 €
April 533 99 €
May 652 121 €
June 611 113 €
July 679 126 €
August 604 112 €
September 425 79 €
October 350 65 €
November 146 27 €
December 107 20 €
Total 4 900 908 €

To build non-binding offer we need the evidence base:

  • If you have - your idea
  • Photo documentation or inspect the property
  • The price of electricity and the total annual consumption
  • Possibilities of electricity for household use - storage in batteries, or in the water tank
  1. Based on the information you entered a non-binding offer and the estimated return on investment.Duration: max. 3 days.
  2. Upon acceptance of the offer will propose a final solution with quantified itemized budget. Duration: max. 7 days.
  3. We send you a draft agreement and power of attorney to ensure the necessary administrative. Duration: 24 hours.
  4. After signing a contract for work and powers of attorney for you to submit all the necessary administrative documents - an application for a grant application for connection to the grid, etc. Duration: max. 3 days.
  5. After signing a contract for work and powers of attorney for you to submit all the necessary administrative documents - an application for a grant application for connection to the grid, etc. Duration: max. 30 days. (it depends on the response from the distribution system operators and the Ministry of the Environment).
  6. Upon receipt of the necessary documents and performing the installation of solar power. Duration: max. 21 days.
  7. We provide complete the steps for connecting to the distribution network and the smooth running of the plant (ed. Change the wording) Duration: max. 30 days. (Apply for the first parallel connection to the grid. It depends on the response from the DSOs).
  8. Transmit all documents - contracts, project documentation, revision etc. Duration: max. 7 days.
  9. There will be a formal handover and issuing the final statement Duration: 24 hours..
  • For me photovoltaic power appropriate?Installing a photovoltaic power plant is recommended for houses that consume electricity more than 5 MWh per year. It is very convenient when heating water, electricity, have air conditioning, household operation during the day, or perhaps pool heating. It is by no means a necessity, but the goal is to consume all of the electricity produced within the property.
  • There are several types of photovoltaic panels?Photovoltaic panels are divided into three types:
    Monocrystalline solar panel: have been installed in the Czech Republic rather earlier today they are replaced by polycrystalline PV modules.
    Polycrystalline PV panel: it is the most widely used solar panels in the country. Their advantage is a large production with ideal exposure and high efficiency depending on the area. The disadvantage is that they are very sensitive to the inclination and orientation. Overcast achieve low yields.
    Amorphous solar panel: This is the latest technology. Their advantage is high production even under a cloudy sky and worse orientation. Absorb and diffuse - reflected solar radiation. The disadvantage is the low efficiency depending on the area.
  • What type of roof I put PV panels?Mounting systems now enable installation on any roof type and slope.
  • How much space do I need?1 kWp installed capacity of PV modules Polycrystalline need approximately 7 m2, Amorphous approximately 12 m2.
  • How large photovoltaic power plant is right for me?For standard RD suitable size 3-7 kWp. It depends on consumption in the building. The "new green savings" in addition subsidizes photovoltaic plants of up to 10 kWp.
  • When I ask for your photovoltaic power subsidies?Yes. Any information on how you can help with that here.
  • How long does the process take?The entire process, including handling paperwork can take up to three months. The actual installation takes a maximum of three weeks.
  • I need a building permit?Photovoltaic power is closely associated with the property itself. Alter her appearance or manner of use. Just notice.
  • As a complex administrative process? Who handles the individual steps?Administrative steps do for you. We only need your cooperation.
  • What is the return on investment?Return on investment depends on the electricity price you pay. The amount of electricity they consume in real estate and the grant amount. Usually around 10 years. An example can be found in the table savings.
  • What is the lifetime of photovoltaic power plant?Lifetime photovoltaic power plant is up to 30 years.
  • Cle I plant barley?Photovoltaic panels have all the certifications and declarations.

Do you want more information?

Leave us your contact information and we will contact you.

* fields marked with a star are required

All the paperwork associated with the construction of photovoltaic power glad to arrange it for you. We have a long experience with projects and we use that info to the smooth operation of the whole building.

For installation and connection of photovoltaic power plants are the most important:

  • The new subsidy program "The new green savings".More information can be found on the website of the subsidy title www.novazelenausporam.cz.
  • Building Act no. 183/2006 Coll.
  • Rules concerning the operation of the distribution system.For more information, visit the company's website: ČEZ, E-on and PRE.

Reference

The projects that we have implemented

Family house, Pyšely (CR)

Installation of photovoltaic power plants (5 kWp).

Family house and outbuilding, Dobronice (CR)

Installation of photovoltaic power plants. (12 kW).

House and garage, Veverská Bítýška (CR)

Installation of photovoltaic power plants. (6 kW).

Luxury villa, Březiněves (CR)

Installation of photovoltaic power plants. (5 kWp).

Technical buildings, Lučice (CR)

Installation of photovoltaic power plants. (4.7 kWp).

Family house, Okříšky (CR)

Installation of photovoltaic power plants. (4.7 kWp).

Family house, Všechromy (CR)

Installation of photovoltaic power plants (4.2 kWp).
Installation of photovoltaic power plants (7 kWp).

Family house, Bílek (CR)

Installation of photovoltaic power plants (7 kWp).
Installation of photovoltaic power plants (5 kWp).

Family house, Kněžice (CR)

Installation of photovoltaic power plants (5 kWp).